Kalmar Rubber Tyred Gantry Crane Electrical/Mechanical Installation Manual


Kalmar Rubber Tyred Gantry Crane Electrical/Mechanical Installation Manual

Type of machine: Rubber Tyred Gantry Crane
Language and Format: English/PDF
Instant Download after payment. Please make sure your email address is correct.

__________________
Table of contents:
Content for Electrical Manual 63 pag:
1.0 Portals
2.0 Floodlights
3.0 Front frame
4.0 Electrical equipment house (EE house)
5.0 Rear frame
6.0 Access lights
7.0 Trolley
10.0 Spreader
11.0 Equipotential cables

Content for Mechanical Installation Manual 163 pag:
1.0 General instructions
2.0 Preparatory actions on the site
3.0 Identifying the main components
4.0 Main beams
5.0 Columns
6.0 Front and rear frames
7.0 Preparing the portals
8.0 Actions before mounting
9.0 Cleaning the joint surfaces of the main components
10.0 MOUNTING
11.0 Power unit
12.0 EE house
13.0 Rear frame walkways
14.0 Actions after mounting
15.0 Exhaust pipe
16.0 Transport stands
17.0 Preparing the trolley
18.0 Lifting the trolley onto the containers
19.0 Preparing the trolley on the containers
20.0 Lifting the trolley onto the main beams
21.0 Actions on top of the main beams
22.0 Spreader